İÇDAŞ - Bekirli 2x600 MW SCPP Boiler Maintenance
- Customer
- İÇDAŞ Elektrik Enerjisi Üretim ve Yatırım A.Ş.
- Location
- Bekirli/Biga/Çanakkale
- Start Date
- 22.03.2021
- Completion Date
- 17.07.2021
During the scheduled outage at the employer’s 2x660 MW Power Plant in Bekirli, the boiler was recommissioned following the revision of LUVO (Rotary Air Preheater) units A and B, and the modification of SH (Superheater) tubes and supports.