ENKA - Misrata SCPP 650 MW GT Installation

image

ENKA - Misrata SCPP 650 MW GT Installation

Customer
ENKA İnşaat ve Sanayi A.Ş. - ENKA Branch Office Tripoli
Location
Misrata/Libya
Start Date
19.04.2021
Completion Date
31.12.2022

Project Description
The installation works for two sets of Siemens 4000F gas turbines, including the Air Intake, Piping Systems, Diffuser, T-Box, BOP (Balance of Plant), and Stack equipment, have been completed at the 650 MW Misrata Simple Cycle Power Plant (SCPP), where the main employer is the Libya General Electricity Company (GECOL).

The gas turbines are dual-fuel units capable of operating on two types of fuel. The primary fuel is natural gas, while the backup fuel is light distillate oil (LDO).